Transportation Safety System of the “Adler Bypass” Highway, phase 1, 3, 4, 5.1
Design of the transportation safety system, cable ducts, utility infrastructure of the “Adler Bypass” Highway, phase 1, 3, 4, 5.1
-
Project description:
Development of detailed documentation for the project: “Adler Bypass Highway,” phase 1. Preparatory construction phase. Interchange with federal highway A-149 (Adler–Krasnaya Polyana), phase 3: Construction of a highway tunnel; phase 4: Main construction phase; and phase 5.1: U-turn overpass across highway A-147.
-
Project objectives:
Development of detailed documentation. Transportation safety system for the reconstruction of the existing overpass. Reconstruction of the cable duct system. Reconstruction of the transportation safety cable line. Reconstruction of communication lines. Reconstruction of the transportation safety post. Engineering support for the reconstruction of the existing underground pedestrian underpass.
-
Implementation period: 2024 – 2026 years
Used equipment
- office 408, 4, lit. K, Fuchika St., St. Petersburg, 192102, Russia
- +7 (812) 775-10-82
- office@ntc-ksm.ru
- Opening hours: Mon-Fry с 9:00 AM до 06:00 PM MSK


