Engineering Systems Monitoring, Structural Health Monitoring System, Transportation Safety System of the Kazan–Yekaterinburg Highway on the Dyurtuli–Achit section

Design of key construction elements of the “Kazan–Yekaterinburg” highway on the “Dyurtuli–Achit” section

  • Project description:

    Development of the “Construction Organization Plan” section of the design documentation of the project: “Construction of the Kazan–Yekaterinburg Highway on the Dyurtuli–Achit section, phase 1: km 0–km 140, Republic of Bashkortostan.” Phase 1.3.1: Major construction projects. Construction section km 0 – km 90. Preparation of materials regarding the temporary power supply for the bridge across the Belaya River for inclusion in the “Construction Organization Plan” section.

  • Project objectives:

    Development of design documentation. Engineering systems monitoring. Structural health monitoring system. Transportation safety system.

  • Implementation period: 2023 year

Used solutions

KSM.Flow

KSM.Flow

Automated Traffic Control System

Read more

Used equipment