Structural Health Monitoring System of the bridge across the Oka River on the Moscow–Nizhny Novgorod–Kazan Highway
Design of the Structural Health Monitoring System of the bridge across the Oka River on the «Moscow–Nizhny Novgorod–Kazan» highway
-
Project description:
A comprehensive set of design works for the engineering systems of the bridge across the Oka River as part of the project under construction: M-12 “Moscow–Nizhny Novgorod–Kazan highway (under construction),” Phase 4, km 224–km 347, Vladimir and Nizhny Novgorod Regions (from the intersection with regional highway 17K-2 “Murom–M-7 ‘Volga’” to the intersection with federal highway R-158 “Nizhny Novgorod–Arzamas–Saransk–Issa–Penza–Saratov”).
-
Project objectives:
Development of detailed documentation. Engineering systems monitoring.
-
Implementation period: 2022 – 2023 years
Used equipment
- office 408, 4, lit. K, Fuchika St., St. Petersburg, 192102, Russia
- +7 (812) 775-10-82
- office@ntc-ksm.ru
- Opening hours: Mon-Fry с 9:00 AM до 06:00 PM MSK


