Transportation Safety Systems of the Yuzhno-Sakhalinsk Bypass, phase 1

Design of the transportation safety system of the highway connecting the Yuzhno-Sakhalinsk–Kholmsk and Yuzhno-Sakhalinsk–Okha routes, phase 1

  • Project description:

    Development of the “Transportation Safety System” section of the design documentation for phase 1 of the capital construction project “Construction of a highway connecting the Yuzhno-Sakhalinsk–Kholmsk and Yuzhno-Sakhalinsk–Okha routes”.

  • Project objectives:

    Development of design documentation. Transportation safety system.

  • Implementation period: 2025 year

Used solutions

KSM.Flow

KSM.Flow

Automated Traffic Control System

Read more