Automated Traffic Control System, Toll Collection System, Structural Health Monitoring System of the Gagarin avenue bypass in Nizhny Novgorod

Design of an automated traffic control system, a toll collection system, and a structural health monitoring system of the bridge of the Gagarin avenue bypass across the Oka River in Nizhny Novgorod

  • Project description:

    A comprehensive set of design and survey works for the project: Gagarin avenue bypass in Nizhny Novgorod (phase 4).

  • Project objectives:

    Development of design documentation. Automated traffic control system. Toll collection system. Structural health monitoring system for the bridge’s engineering structures during the operational phase. Support of the developed design documentation during the state expert review.

  • Implementation period: 2021 – 2023 years

Used equipment