Structural Health Monitoring System of the bridge over the Pur River, Yamalo-Nenets Autonomous District

Installation of Structural Health Monitoring System for engineering structures of the bridge crossing over the Pur River on the Korotchaevo-Urengoy Highway

  • Project description:

    Installation of Structural Health Monitoring System for load-bearing structures at the facility: “Construction of a section of a public highway of regional or intermunicipal importance in the Yamalo-Nenets Autonomous District of Korotchaevo-Krasnoselkup, including the bridge over the Pur River.”

  • Project objectives:

    Installation of a system for monitoring load-bearing structures. Supply of equipment and materials. Construction and installation work for the installation of equipment for the Structural Health Monitoring System. Commissioning works. Contents of the Structural Health Monitoring System.

  • 2020 – 2022

Still have questions?
Shall we discuss the project?

+7 (812) 775-10-82 Mon-Fry 9:00 AM - 06:00 PM MSK office@ntc-ksm.ru

    Leave your details and we will contact you as soon as possible