Automated Traffic Control System, Toll Collection System, Weigh-in-motion control system, Engineering Systems Monitoring, Structural Health Monitoring System of the bridge crossing over the Vistula Bay
Design of system-wide solutions for an intelligent transport system and Engineering Systems Monitoring as well as structures of a bridge crossing across the Vistula Bay with approaches
-
Project description:
Performance of work regarding the development of design documentation for the facility: stage 11 of the construction of the Circular route in the Primorsky recreational area – “Bridge crossing over the Vistula Bay with approaches (from the settlement of Kosmodemyansky to the settlement of Shosseinoye).”
-
Project objectives:
Development of design documentation. Toll Collection System. Automated Traffic Control System (technological solutions for the base line of the highway and toll collection points). Road integrated communication system. Weigh-in-motion control system. Engineering Systems Monitoring. Structural Health Monitoring System.
-
2019 – 2021
Still have questions?
Shall we discuss the project?
+7 (812) 775-10-82
Mon-Fry 9:00 AM - 06:00 PM MSK
office@ntc-ksm.ru
- office 408, 4, lit. K, Fuchika St., St. Petersburg, 192102, Russia
- +7 (812) 775-10-82
- office@ntc-ksm.ru
- Opening hours: Mon-Fry с 9:00 AM до 06:00 PM MSK