Automated Traffic Control System, Toll Collection System, Weigh-in-motion control system, Engineering Systems Monitoring, Structural Health Monitoring System of the bridge crossing over the Vistula Bay

Design of system-wide solutions for an intelligent transport system and Engineering Systems Monitoring as well as structures of a bridge crossing across the Vistula Bay with approaches

  • Project description:

    Performance of work regarding the development of design documentation for the facility: stage 11 of the construction of the Circular route in the Primorsky recreational area – “Bridge crossing over the Vistula Bay with approaches (from the settlement of Kosmodemyansky to the settlement of Shosseinoye).”

  • Project objectives:

    Development of design documentation. Toll Collection System. Automated Traffic Control System (technological solutions for the base line of the highway and toll collection points). Road integrated communication system. Weigh-in-motion control system. Engineering Systems Monitoring. Structural Health Monitoring System.

  • 2019 – 2021

Still have questions?
Shall we discuss the project?

+7 (812) 775-10-82 Mon-Fry 9:00 AM - 06:00 PM MSK office@ntc-ksm.ru

    Leave your details and we will contact you as soon as possible