Automated Traffic Control System and Toll Collection System of the Moscow – Nizhny Novgorod – Kazan route

Design of system-wide solutions for an intelligent transport system on the Moscow – Nizhny Novgorod – Kazan highway under construction

  • Project description:

    Development of design documentation for the project: “M-12 “Moscow – Nizhny Novgorod – Kazan” Highway under construction, stage 8 km 663 – km 729 with a bridge crossing over the Volga River, Republic of Tatarstan (from the intersection with the r-241 “Kazan – Buinsk – Ulyanovsk” Federal highway to the intersection with the “Sorochi Gory –  Shali” regional highway).

  • Project objectives:

    Development of design documentation. Automated Traffic Control System. Toll Collection System. Structural Health Monitoring System. Support of the developed Design documentation in the State expert assessment department.

  • 2020 – 2021